HERAKLION-CRETE

There are 4 Photovoltaic Roof Parks installed in Crete of total power 320KW (80KW each).
Three of them are located on the roofs of the company's factories in the Industrial Area of Heraklion, while the fourth is on the roof of the company's first factory in Melidochori village in the center of the Heraklion County. Each park is autonomous with identical equipment. The total of the electrical and other equipment of the PV plant is of German origin. The total of the Cretan parks’ annual energy production amounts to 560.000 KWh while avoiding the emission of 420 tons of CO2 into the atmosphere.
 