REZA

Photovoltaic Park "Reza" is installed with a power of two (2) MW. It is also located near the community of Neochoraki Thebes in the Boeotia County. The park's annual energy production amounts to 3.300.000 KWh while avoiding the emission of 2475 tons of CO2 into the atmosphere. The total of the electrical and other equipment of the PV plant is of German origin.

Photo gallery